Get the latest updates on news and announcements, technical solutions and background articles.
by VIKTOR
Digital models were set up parametrically to produce a detailed 3D model, consisting of numerous drawings, of the A16 tunnel in Rotterdam that enables effective adaption to possible design changes.
Read moreby VIKTOR
Sweco: “In 1 day we developed an application that saves time and reduces the chance of errors”
Read moreby VIKTOR
Heijmans: “The luxury of having a tool that takes over 80% of the work, quickly becomes your standard”
Read moreby VIKTOR
The three major construction companies BAM, Ballast Nedam and Heijmans will jointly automate part of their engineering processes. With the help of the VIKTOR platform, this collective will develop an application that accelerates the design process of soil bodies.
Read moreGet the latest updates on news and announcements, technical solutions and background articles.
by VIKTOR
Digital models were set up parametrically to produce a detailed 3D model, consisting of numerous drawings, of the A16 tunnel in Rotterdam that enables effective adaption to possible design changes.
Read moreby VIKTOR
Sweco: “In 1 day we developed an application that saves time and reduces the chance of errors”
Read moreby VIKTOR
Heijmans: “The luxury of having a tool that takes over 80% of the work, quickly becomes your standard”
Read moreby VIKTOR
The three major construction companies BAM, Ballast Nedam and Heijmans will jointly automate part of their engineering processes. With the help of the VIKTOR platform, this collective will develop an application that accelerates the design process of soil bodies.
Read moreRead all about how VIKTOR solutions are succesfully applied to real-life customer cases from industry-leading companies
Read moreGet in-depth insight into topics like parametric design, digital transformation, and creating web-based applications.
Read more