Sign In
See VIKTOR solutions in action through real use cases from industry leaders and success stories.
Disciplines
Integrations
March 12, 2020
During hot summer days the metal of the Binnenhavenbrug swells so much, that the bridge can no longer open or close. VIKTOR has developed an early warning system as solution!
Read moreNovember 07, 2019
The Theemsweg route is a new railway viaduct, which allows uninterrupted train traffic on the first part of the Betuwelijn, without having to stop for ships. A challenging project for VIKTOR and Wagemaker, who is responsible for the engineering of the substructure of the route!
Read moreMarch 14, 2019
The parameterization of parts of underpass designing is a very attractive option, for it optimalizes and speeds up the process significantly.
Read moreSee VIKTOR solutions in action through real use cases from industry leaders and success stories.
Category
Disciplines
Integrations
March 12, 2020
During hot summer days the metal of the Binnenhavenbrug swells so much, that the bridge can no longer open or close. VIKTOR has developed an early warning system as solution!
Read moreNovember 07, 2019
The Theemsweg route is a new railway viaduct, which allows uninterrupted train traffic on the first part of the Betuwelijn, without having to stop for ships. A challenging project for VIKTOR and Wagemaker, who is responsible for the engineering of the substructure of the route!
Read moreMarch 14, 2019
The parameterization of parts of underpass designing is a very attractive option, for it optimalizes and speeds up the process significantly.
Read moreExplore, learn and get inspired. The blog is all about: Automate the boring. Engineer the awesome!
Get in-depth insight into topics like parametric design, digital transformation, and creating web-based applications.