Customer cases

See VIKTOR solutions in action through real use cases from industry leaders and success stories.

Disciplines

Geotechnical

Integrations

All

July 02, 2026

How AECOM Automated CPT Analysis for a 120,000+ Data Point Project with VIKTOR

Discover how AECOM automated the processing of more than 120,000 CPT data points with VIKTOR, replacing manual Excel workflows with a scalable geotechnical application that improves consistency, quality assurance, and engineering efficiency.

Read more

April 15, 2020

BAM Centralizes Excel Data for Gravity-Based Foundation Analysis: From 5 Days to 4 Hours

BAM: “From 5 days to 4 hours”, huge time savings with the gravity based foundation application made with VIKTOR!

Read more

April 02, 2020

Heijmans Builds Reusable Parametric Design Apps with VIKTOR for Use Across Many Projects

Heijmans has been working on the development of generic parametric design applications that can be used to automate and optimize processes in many different projects. Read more about it here!

Read more

March 31, 2020

Heijmans Automates 80% of Dike Design Work using PLAXIS, SCIA and D-Sheet in VIKTOR

Heijmans: “The luxury of having a tool that takes over 80% of the work, quickly becomes your standard”

Read more

March 14, 2019

Heijmans Achieves Faster Underpass Design by Connecting SCIA and D-Foundations in VIKTOR

The parameterization of parts of underpass designing is a very attractive option, for it optimalizes and speeds up the process significantly.

Read more

Customer cases

See VIKTOR solutions in action through real use cases from industry leaders and success stories.

Category

Civil

Disciplines

Geotechnical

Integrations

All

July 02, 2026

How AECOM Automated CPT Analysis for a 120,000+ Data Point Project with VIKTOR

Discover how AECOM automated the processing of more than 120,000 CPT data points with VIKTOR, replacing manual Excel workflows with a scalable geotechnical application that improves consistency, quality assurance, and engineering efficiency.

Read more

April 15, 2020

BAM Centralizes Excel Data for Gravity-Based Foundation Analysis: From 5 Days to 4 Hours

BAM: “From 5 days to 4 hours”, huge time savings with the gravity based foundation application made with VIKTOR!

Read more

April 02, 2020

Heijmans Builds Reusable Parametric Design Apps with VIKTOR for Use Across Many Projects

Heijmans has been working on the development of generic parametric design applications that can be used to automate and optimize processes in many different projects. Read more about it here!

Read more

March 31, 2020

Heijmans Automates 80% of Dike Design Work using PLAXIS, SCIA and D-Sheet in VIKTOR

Heijmans: “The luxury of having a tool that takes over 80% of the work, quickly becomes your standard”

Read more

March 14, 2019

Heijmans Achieves Faster Underpass Design by Connecting SCIA and D-Foundations in VIKTOR

The parameterization of parts of underpass designing is a very attractive option, for it optimalizes and speeds up the process significantly.

Read more

Blog

Explore, learn and get inspired. The blog is all about: Automate the boring. Engineer the awesome!

Read more

White Papers & Guides

Get in-depth insight into topics like parametric design, digital transformation, and creating web-based applications.

Read more